Holyoke Center, Harvard University

Richard A. and Susan F. Smith Campus Center
Threatened
  • Modern Movement
  • Identity of Building/Site
  • History of Building/Site
  • General Description
  • Evaluation
  • Documentation

Holyoke Center, Harvard University

Above: North Facade. Below: overview

Credit

Fig. 6 Holyoke Center, Harvard University, Cambridge, Massachusetts, 1965. architects: Sert, Jackson & Associates. (1982). Process: Architecture. (34), 109

Site overview

Holyoke Center, which occupies a full city block in the heart of Harvard Square, is a ten-story, 360,000 square foot facility originally designed by architect José Luis Sert in 1960. It is the main administration building of Harvard University and was the first high rise on campus. The design gave rise to much controversy. Some considered the building to be too high, too large, and showing no respect to the historic Cambridge neighborhood in which it was located. The site was surrounded by historic brick buildings with Georgian roofs, many no more than two stories. The building was called “grey elephant” due to its Brutalist reinforced concrete facades. Although the building has undergone several rounds of restoration and improvement, it is today considered a successful architectural experiment.

Holyoke Center, Harvard University

Above: North Facade. Below: overview

Credit

Fig. 6 Holyoke Center, Harvard University, Cambridge, Massachusetts, 1965. architects: Sert, Jackson & Associates. (1982). Process: Architecture. (34), 109

Site overview

Holyoke Center, which occupies a full city block in the heart of Harvard Square, is a ten-story, 360,000 square foot facility originally designed by architect José Luis Sert in 1960. It is the main administration building of Harvard University and was the first high rise on campus. The design gave rise to much controversy. Some considered the building to be too high, too large, and showing no respect to the historic Cambridge neighborhood in which it was located. The site was surrounded by historic brick buildings with Georgian roofs, many no more than two stories. The building was called “grey elephant” due to its Brutalist reinforced concrete facades. Although the building has undergone several rounds of restoration and improvement, it is today considered a successful architectural experiment.

How to Visit

Street level retail/restaurant arcade open to the public

Location

75 Mt Auburn St
Cambridge, MA, 02138

Country

US
More visitation information

Case Study House No. 21

Lorem ipsum dolor

Above: North Facade. Below: overview
Credit: Fig. 6 Holyoke Center, Harvard University, Cambridge, Massachusetts, 1965. architects: Sert, Jackson & Associates. (1982). Process: Architecture. (34), 109
Above: North Facade. Below: overview
Credit: Fig. 6 Holyoke Center, Harvard University, Cambridge, Massachusetts, 1965. architects: Sert, Jackson & Associates. (1982). Process: Architecture. (34), 109

Designer(s)

Joseph Zalewski

John E. Nickolas

Sert Jackson and Gourley

Other designers

Sert, Jackson and Gourley, Joseph Zalewski and John E. Nickolas, AssociatesLandscape/garden designers: Sasaki, Walker and Associates

Related chapter

New England

Commission

1958

Completion

1966

Commission / Completion details

1958/1966

Significant Alteration(s) with Date(s)

1979-1985, Concrete Fin Replacement1980-1981, Curtain Wall Improvement1983, 6th and 8th Floor Renovation1984-1985, 3rd and 5th Floor Renovation1994-1996, UHS Renovation1999-2000, Arcade Improvements

Current Use

Holyoke Center is the main administration building of Harvard University. It includes underground parking, the arcade, shops, and a bank at street level, university offices above, and a fully equipped infirmary, and University Health Services.

Current Condition

Good

General Description

Holyoke Center, occupies a full city block in the heart of Harvard Square, is a ten-story, 360,000 square foot facility originally designed by José Luis Sert in 1960. The main plan of the concrete structure is H-shaped, with the north wing along Massachusetts Avenue and south wing along Mt. Auburn Street. The central connecting portion sets back from both Dunster Street and Holyoke Street, is approximately the same width as the two wings. The structural height is 133 feet, and the total height is 167 feet. Holyoke Center is the main administration building of Harvard University. At street level, a pedestrian arcade, occupying two stories in height, runs through the block. Originally, the arcade was no more than a link connecting the Harvard Yard and the river houses and the main entrance to the offices. Then in 1993, as part of “The Shops by Harvard Yard” project, ten kiosks along the arcade were opened after renovation. In 1999, two glass gates on each side were installed to block out the wind and for security reasons. Now it is an active area because it is the main entrance to the offices and to several shops and restaurants as well. On the north of the site there is a branch bank, while in the south, the heath center reception and a library. The above floors of the building were occupied by university administration offices, University Health Services including a fully-equipped infirmary. And there is a parking garage underground. The facades show the architect’s ideas of modernism. The patterns of the windows and sandwich panels are “random”, which present the variations inside. The glass of the windows is held by metal frames. Across each window, on three sides (except north side where the window bars are brick red) of the building, there are red, orange, and yellow bars. Large sheets of windows are designed to “frame the view”. All the windows cannot open.

Construction Period

The construction of Holyoke Center had four phases. Phase 1 completed in 1961. The south half of the H-shaped building was built, and University’s Health Services moved into the completed wing. The building was expanded on the east side at street level in the Phase 2 in 1963. In 1966, the north wing was built in Phase 3. The majority of the construction completed. In the same year, in Phase 4 a bank was built on the north of the site, until then, the whole construction was finished.

Original Physical Context

Holyoke Center was designed by José Luis Sert in 1950’s, as an administration building of Harvard University. Mr. Sert was a world class architect, and also a former dean of Graduate School of Design in Harvard University. It was the first high rise building in Harvard University. The design gave rise to much controversy. The building was thought to be too high, too large, and showed no respect to the historic area it located. The site was surrounded by historic brick buildings no more than two stories. And most of those buildings had Georgian roofs. The building was called “grey elephant” due to its Brutalism reinforced concrete facades.

Technical

Holyoke Center was the only high rise cast-in-place concrete building in Harvard University at that time. The innovation with a new type of surface was an architectural experiment. But the concrete started to crumble 15 years after its completion. The configurations of the facades were also advanced for its time. Alternated with clear glasses, the translucent sandwich panels allow much sunshine getting into the interior spaces. However, both the windows that opened were not, and the “three-pipe” system contributed to the serious energy costs issue.

Social

\"Holyoke stands as a prototype of process more than of form.” Holyoke Center was built in its time.

Cultural & Aesthetic

It was the first high rise building in that area. It was the beginning of modern architecture activity of Harvard University. After its construction, Harvard Science Center and Peabody Terrace were built as a consequence.

General Assessment

The value of this building is considered as a symbol of modern architecture activity in Harvard University in 1960’s. Its innovation of new materials and new structure were very advanced for its time. Although the restorations and improvements never stop, it is thought to be a successful architectural experiment.

References

Knight, R. F. (1966). The Holyoke Center: a few comments. Connection. 4-9.Holyoke Center at Harvard University. (1962). Architectural Record. 132-137.Holyoke Center, Harvard University, Cambridge, Massachusetts, 1965. architects: Sert, Jackson & Associates. (1982). Process: Architecture. (34), 108.Josep M. Rovira, Sert half a century of architecture: 1928-1979, complete work, [Barcelona] : Fundacio? Joan Miro?, c2005, pp247-255.Sofia Cheviakoff, Alberto Duarte, Josep Llui?s Sert / [editor Sofia Cheviakoff], Gloucester, Mass, [Great Britain]: Rockport, 2003, pp8.Anrea O. Dean, Evaluation: 'Gray elephant' in Harvard Square: Holyoke Center, most successful of the university's first-generation highrises, AIA Journal 1979 Jan., v.68, n.1, p.48-51.http://www.thecrimson.com/article.aspx?ref=218223, CHRISTOPHER J. GEORGES, Holyoke Center Crumbles, The Harvard Crimson Online Edition, November 2, 1983.
About
  • Docomomo US
  • US Board of Directors
  • Partner Organizations
  • Terms of Use
  • Site Credits
  • Contact
Membership
  • Membership Overview
  • Why you should become a member
  • Join
  • Members & Supporters

© Copyright 2025 Docomomo US

Donate

Donations keep vital architecture alive and help save threatened sites around the country. Docomomo US relies on your donations to raise awareness of modern design and advocate for threatened sites. Donate today ›